© 2024 All rights reserved
South African oil company Sasol has recently announced the discovery of natural in area PT5-C, located in the southern part of Inhassoro District, Inhambane Province, Mozambique. This discovery was made following the drilling (between 25 March – 5 April) of the Bornito-1 exploration well which reached a maximum depth of 1934 meters in lower cretaceous sediments. This was the second well drilled in the area, and the first successful as the first drilled well – Dourado-1 – did not find any hydrocarbons.
The following is a brief summary of some key legal and contractual terms which support the PT5-C license:
First sub-period (48 months):
Second sub-period (24 months):
Third sub-period (24 months):
Cost recovery is capped at 60% of Disposable Petroleum (Cost Petroleum).
© 2024 All rights reserved
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |